EMPLOYEE DORMITORY SOLUTION
- Chen David
- 11 minutes ago
- 2 min read
Providing Scalable, Affordable Employee Dormitories with Light Steel Prefab Solutions
In today’s fast-moving industries—construction, agriculture, manufacturing—the demand for safe, comfortable, and quickly deployable workforce housing is higher than ever. Deepblue Smarthouse proudly offers a turnkey Employee Dormitory Solution that meets these needs with efficiency and affordability.

Why Modular Dormitories?
Our modular light steel frame structures provide a highly efficient solution for developers and contractors who need housing for 50 to 500+ employees. With the ability to house 2–4 occupants per unit, each dormitory includes a private bathroom and essential amenities. The design is compact, durable, and optimized for fast assembly—units can be delivered and installed within just 30 to 60 days.
Key Benefits of Our Dormitory Systems:
Modular Light Steel Frame Structure – Long-lasting, weather-resistant, and seismic/hurricane resilient.
Fast Construction – 30–60 days from factory to site handover.
Cost-Saving Efficiency – Save up to 50% on material, 40% on time, and 30% on labor.
Certified for Quality – Fully compliant with ICC-ES and HUD standards.
Use Case Scenarios
Our dormitory solutions are ideal for:
Remote construction camps
Factory or industrial housing
Agricultural and seasonal worker camps
Hospital and university staff quarters
Proven Experience You Can Rely On
Deepblue Smarthouse brings over 16 years of expertise in prefab steel housing, with successful projects delivered in over 60 countries. Our high production capacity, streamlined supply chain, and expert engineering ensure quality delivery that adapts to your location and code requirements.

Budget Snapshot: Sample Project (150 Units)
Here’s an estimated breakdown for a typical 150-unit dormitory project:
Item | Unit Price (USD) | Quantity | Subtotal (USD) | Notes |
Prefab Dorm Structure (LGSF) | $320/m² | 6000 m² | $1,920,000 | Includes steel frame, walls, roof |
Interior Fit-Out (Basic) | $180/m² | 6000 m² | $1080,000 | Includes bathroom, insulation, MEP prep |
Factory Prefab Cost | - | - | $350,000 | Engineering, labor, QA/QC |
Sea Freight (FOB China) | $3,500/container | 30 | $105,000 | Approximate for 150 units |
On-site Installation Support | $300/day/person | 2 x 30 days | $18,000 | Technical guidance only |
Total Estimated Cost | $3,473,000 | For 150 dorm units | ||
Average Unit Cost | $23153.33 | Excludes foundation and permits |
Note: Actual cost may vary by site location, customization, and shipping method.
Comments