top of page

Full Size

The Arctic 7.0  (New)

Arctic-7.0-4.png
  • Length: 7m water (7.5m total)

  • Width: 2.5m water (3m total)

  • Depth: 1.55m water

  • Material: Stone coping

  • Fully-tiled (Spanish tile)

The Atlantic 6.0

The Arctic 7.0  (New).png
  • Length: 6m water (6.5m total)

  • Width: 2.5m water (3m total)

  • Depth: 1.55m water

  • Material: Stone coping

  • Fully-tiled (Spanish tile)

The Pacific 5.0

The Atlantic 6.0.png
  • Length: 5m water (5.5m total)

  • Width: 2.5m water (3m total)

  • Depth: 1.55m water

  • Material: Stone coping

  • Fully-tiled (Spanish tile)

Our Story

Every website has a story, and your visitors want to hear yours. This space is a great opportunity to give a full background on who you are, what your team does, and what your site has to offer. Double click on the text box to start editing your content and make sure to add all the relevant details you want site visitors to know.

If you’re a business, talk about how you started and share your professional journey. Explain your core values, your commitment to customers, and how you stand out from the crowd. Add a photo, gallery, or video for even more engagement.

Plunge Pools

The Southern 4.0

The Southern 4.0.png
  • Length: 4m water (4.5m total)

  • Width: 2.5m water (3m total)

  • Depth: 1.55m water

  • Material: Stone coping

  • Fully-tiled (Spanish tile)

The Tasman 3.0

The Tasman 3.0.png
  • Length: 3m water (3.5m total)

  • Width: 2.5m water (3m total)

  • Depth: 1.55m water

  • Material: Stone coping

  • Fully-tiled (Spanish tile)

The Baltic 2.5

The Baltic 2.5.png
  • Length: 2.5m water (3m total)

  • Width: 2.5m water (3m total)

  • Depth: 1.55m water

  • Material: Stone coping

  • Fully-tiled (Spanish tile)

Installation Process

  • Note: Before install by your installation contractor, you need building approval. This can take from 24hrs to weeks. For more info, read our 'Do I need building approval?' FAQ.

  • Site Preparation: 

  • Excavation

  • Installation of footings/subbase system

  • Clear access for the delivery vehicle and designated crane size (Council permits may be required)

  • Craning:

  • Lifting and placement of the pool

  • Levelling and backfilling

  • Filling with water (permits may be required due to water restrictions, if applicable at the time)

  • Plumbing & Commissioning:

  • Running all pipework from the pool to the plant room

  • Fitting off the pool filtration and pump system

  • Commissioning the pool using chemicals and water testing supplied by Reece Irrigation & Pools

1.jpg
2.jpg
3.jpg
4.jpg

Choose your mosaic waterline tiles

  • Note: Tile options are subject to availability. View examples of these tiles installed below.

Galapagos.jpg

Galapagos

Corfu.jpg

Corfu

Whyte.jpg

Whyte

Oahu.jpg

Oahu

Whitehaven Sand.jpeg

Whitehaven Sand

Caribe.jpeg

Caribe

Mar.jpeg

Mar

Jonico.jpeg

Jonico

Lagoon.jpg

Lagoon.

Eclipse.jpg

Eclipse

Pas.jpeg

Pas

Nordic White.jpg

Nordic White

Breccia.jpg

Breccia

Pantera.jpg

Pantera

Karacrem Flamed.jpg

Karacrem Flamed

bottom of page